TL;DR:
The steepest tramway with only wheel/rail adhesion was in Montreal (14%), which the replacement buses could not manage in winter.
For reference, this is what a 14% incline looks like. Nothing to sneeze at, note the drastic slowdown and the change in engine sound of the truck.
That does not change much, you still need the infrastructure.