The cable will run from the 49.9MW Willows Green Solar Farm near Felsted will the built mainly under roads for 5.3km east of the proposed solar farm to Braintree Substation near Galleys Corner.

At full capacity, 50MW is enough to power ~60,000 homes! That’s enough for nearly 10% of all of Essex. Glad these are getting connected even though there’s plenty of North Sea oil and gas. UK! UK! UK!

    • gomp
      link
      fedilink
      arrow-up
      25
      ·
      10 months ago

      Absolutely! /s

      TBH, the mods should change the sidebar from “News from around the world!” to something like “News that have international relevance”… otherwise we can’t really scold people who post curiosity stories.

    • lntlOP
      link
      fedilink
      arrow-up
      10
      arrow-down
      18
      ·
      10 months ago

      They’re connecting a large solar farm which has a gloabl impact.

        • lntlOP
          link
          fedilink
          arrow-up
          4
          arrow-down
          4
          ·
          10 months ago

          haha, unfortunately comparisons with this solar farm can only be made in units of “Olympic swimming pools”