I’m all for putting solar panels all over the place, but won’t these get dusty and oily and need loads of cleaning after trains pass over?

Also, costing €623,000 over three years sounds rather expensive for just 100m (although that roughly equates to 11KW).

  • Successful_Try543@feddit.org
    link
    fedilink
    arrow-up
    7
    ·
    edit-2
    1 month ago

    The 600000 € probably include the development cost. Thus, on a larger scale, the cost per unit length will decrease significantly.

      • DaPorkchop_
        link
        fedilink
        arrow-up
        2
        ·
        edit-2
        1 month ago

        That’s like 1/7th of the cost of a single passenger car. I’m sure they can easily afford to take that hit if it doesn’t end up panning out.