This wall was to the supply room with all of the uniforms and PPE. The building was constructed in the mid-20th century so it turns out it’s full of asbestos. Thanks mole man.
This wall was to the supply room with all of the uniforms and PPE. The building was constructed in the mid-20th century so it turns out it’s full of asbestos. Thanks mole man.
It’s a slow process for sure and if someone has to nail a picture to a wall they have to call my boss with 2 days turnaround time for a test