Tests will be carried out at 1.2 mile long low-vacuum track high-speed maglev test facility in Datong, generally used when researching magnetic levitation train technology
Within coming years, the Datong test facility will be extended to 37.2 miles long, to achieve a maximum operating speed of a staggering 5,000km/h.
biiiiig track incoming
from daily mail
That would still be a rough ride for a person, but it could absolutely revolutionize getting construction materials into orbit.