• bob
    link
    121 month ago

    That was the Suez canal not Panama

    • Captain Aggravated
      link
      fedilink
      English
      81 month ago

      Although the Panama canal is a problem too, because Gatun lake is running low. Every cycle of the locks loses a tremendous amount of water.

      • andrew
        link
        fedilink
        English
        41 month ago

        They should just require ships to bring their own water to replace it. 🧠

        • Captain Aggravated
          link
          fedilink
          English
          41 month ago

          My solution is: They’ve got those big ponds where they can somewhat reuse some of the water. Practical Engineering has a video on it (That’s the channel with that guy, Grady, right?) Okay, cover those with solar panels. 1: Less evaporation from there because the panels will block the sun and keep them cooler. 2: energy to run some pumps to at least partially pump some water uphill so less is lost when lowering the outermost locks.

          The big brain am winning again. I am the greetest! Now all we need is the umpty frillion dollars to build it.