• ☆ Yσɠƚԋσʂ ☆OP
    link
    fedilink
    arrow-up
    2
    arrow-down
    1
    ·
    10 months ago

    The fact that you keep repeating that I haven’t responded to your point is precisely why productive discussion is no longer possible. If you want to achieve a civil discussion then you should go back and read my responses, and address them meaningfully.

    • smegforbrains
      link
      fedilink
      arrow-up
      1
      ·
      10 months ago

      I don’t think that’s true. You have on no occasion addressed my argument, that we should not produce more nuclear waste as long as we do not have a long term storage facility. You just said that such a facility can be built, and I agree that it’s technically possible, but not politically feasible at that point in time in Germany. So given the fact that there is no long term storage facility, why do you think that it’s still viable to produce more nuclear waste? That’s what you failed to respond to. Also looking at this discussion you have not once presented data from credible sources to support your claim that this is no issue.

      • ☆ Yσɠƚԋσʂ ☆OP
        link
        fedilink
        arrow-up
        2
        arrow-down
        1
        ·
        10 months ago

        You don’t think it’s true, and I think it is true. Therefore we’re at an impasse here. I’ve responded to your point repeatedly and in different ways. I told you that Germany could build the facilities and negotiate with other countries that already have such facilities in the meantime. Meanwhile, plenty of sources have been presented in this thread, and I’ve specifically presented a source discussing nuclear waste storage. Again, I do not see any value in continuing this discussion with you. I’m entirely comfortable with the points I’ve made here.

        • smegforbrains
          link
          fedilink
          arrow-up
          1
          ·
          edit-2
          10 months ago

          No you did not. Claiming that building such a facility is possible it’s not the same as there actually existing such a facility in Germany.

          Exporting nuclear waste to other countries is not possible because of 2011/70/EURATOM. So the waste has to be handled where it is produced.

          Sources: https://www.base.bund.de/DE/base/bundesamt/aufbau/archiv/bfs-stellungnahmen/DE/2011/02-17-eu-richtlinie.html (Google translation: https://www-base-bund-de.translate.goog/DE/base/bundesamt/aufbau/archiv/bfs-stellungnahmen/DE/2011/02-17-eu-richtlinie.html?_x_tr_sl=auto&_x_tr_tl=en&_x_tr_hl=en-US&_x_tr_pto=wapp)

          I once again responded to your claims with arguments and a credible source. This is IMHO how a civil discussion works.

          • ☆ Yσɠƚԋσʂ ☆OP
            link
            fedilink
            arrow-up
            2
            arrow-down
            1
            ·
            10 months ago

            There is no imminent threat from nuclear waste in Germany, and Germany has been operating reactors for a while now. So, the claim that all of a sudden it’s not possible to do because there’s no facility that’s up to your standards is just fear mongering. The reality is that Germany simply chooses not to build this facility. Also, maybe should read the links you post as it clearly contradicts your claim:

            In addition, the directive also provides for the possibility of transporting spent fuel and radioactive waste to other EU member states or third countries on the basis of bilateral agreements.

            • smegforbrains
              link
              fedilink
              arrow-up
              1
              ·
              edit-2
              10 months ago

              Thank you for trying to use arguments and sources.

              There seems to be another misunderstanding: The cited directive only allows for transportation of nuclear fuel to other EU member states or third party states for e.g. reprocessing. The responsibility for storing the nuclear waste lies with the producer:

              The directive is based on the general principle that ultimate responsibility for the safe disposal of spent fuel and radioactive waste lies with the Member States in whose territory these materials were generated. Specifically, the national framework to be drawn up by the member states must provide that the main responsibility for the disposal of these materials is in principle assigned to the producers. Member States must therefore ensure that anyone who has been granted authorization to carry out an activity related to waste disposal cannot shirk their associated responsibilities

              It’s the same source: https://www-base-bund-de.translate.goog/DE/base/bundesamt/aufbau/archiv/bfs-stellungnahmen/DE/2011/02-17-eu-richtlinie.html?_x_tr_sl=auto&_x_tr_tl=en&_x_tr_hl=en-US&_x_tr_pto=wapp)

              • ☆ Yσɠƚԋσʂ ☆OP
                link
                fedilink
                arrow-up
                2
                arrow-down
                1
                ·
                10 months ago

                What that says is that the responsibility of ensuring safe disposal lies with the states producing nuclear waste. It says nothing regarding where the waste is disposed as far as I can see. So, again, I don’t see anything here there precludes Germany from making a deal say with France to dispose of nuclear waste there while facilities are being built in Germany.

                Meanwhile, the risks of storing nuclear waste on the surface level are a result of unwillingness to build facilities to store nuclear waste underground. It is a self inflicted problem.

                • smegforbrains
                  link
                  fedilink
                  arrow-up
                  1
                  ·
                  edit-2
                  10 months ago

                  The export of radioactive waste is still authorised but under much stricter rules. A nation receiving highly radioactive waste must have a deep underground repository. Such deep geological repositories do not exist anywhere in the world, the commission said, adding that none is under construction outside the EU. It takes at least 40 years to build one.

                  • ☆ Yσɠƚԋσʂ ☆OP
                    link
                    fedilink
                    arrow-up
                    2
                    arrow-down
                    1
                    ·
                    10 months ago

                    Yet, many EU nations use nuclear power, and it accounts for 80% of France’s energy needs. So clearly there is a way to store nuclear waste in EU. What makes Germany such a unicorn?