Yes, it is totally possible to raise and lower the levels of train tracks, but it takes lots of logistics and a long path of gradual elevation change to arrange all that.
You’re not really saying much by pointing out they raised 11foot8 to 12foot4, a whole whopping 8 inches. And it took them how long and how much money to do even that?
Yes, it is totally possible to raise and lower the levels of train tracks, but it takes lots of logistics and a long path of gradual elevation change to arrange all that.
You’re not really saying much by pointing out they raised 11foot8 to 12foot4, a whole whopping 8 inches. And it took them how long and how much money to do even that?
just pointing out that it’s not fixed and it’s not a good example anyway.