• chiliedogg@lemmy.world
    link
    fedilink
    English
    arrow-up
    5
    ·
    7 hours ago

    I work in the development department of a city that’s and enclave for the ultra-rich. Literally every household in the city is millionaires or better.

    Every house in the city is unique. Every build site requires civil and structural engineering. Every home has an architect designing it to be a unique structure. The average new build here is 8-10 million dollars, with the big ones being 50 million+.

    We’re talking tennis pavilions on the roof, indoor arboretums and galleries, the works.

    And they’re all built cheaply and fall apart within a decade.

    They’re shitty houses, but when people are dropping 8-figures on them, they can afford to drop a couple million more on a remodel every 5-10 years.

    You can’t buy a quality house anymore.

    • Jax@sh.itjust.works
      link
      fedilink
      English
      arrow-up
      2
      ·
      edit-2
      7 hours ago

      I’m starting to think the play is to buy undeveloped land and just bite the bullet on the cost of building a house/a road to the nearest govt maintained road.

      • chiliedogg@lemmy.world
        link
        fedilink
        English
        arrow-up
        3
        ·
        6 hours ago

        Unless you’re physically building it yourself, it’s still gonna get corners cut at every stage.

        Also, don’t underestimate the drainage and erosion control engineering required for a home and a road. Those cookie cutter neighborhoods have regional drainage and detention. Your undeveloped land won’t.

        • Jax@sh.itjust.works
          link
          fedilink
          English
          arrow-up
          1
          ·
          6 hours ago

          I’m sure with some research you could find a company willing to follow your specifications and instructions, but obviously that comes with cost.

          To your second point, thanks for the heads up. There’s plenty more research that I need to do before I worry about drainage, but I’ll keep the thought in mind.

          • chiliedogg@lemmy.world
            link
            fedilink
            English
            arrow-up
            3
            ·
            6 hours ago

            Septic and Drainage should come before any kind of detailed architecture. It’ll save you 30 grand in Engineering revisions if you don’t have to re-do the drainage plans.

            Also, never let an architect be in charge of a project. It’s like having the font designer be in charge of office software.