Not so friendly reminder that musk specifically came up with, and pushed, for hyperloop knowing that it would never be made, as an effort to stop the development of highspeed rail in America and shift all political discussions of it because “something better is around the corner”:

As I’ve written in my book, Musk admitted to his biographer Ashlee Vance that Hyperloop was all about trying to get legislators to cancel plans for high-speed rail in California—even though he had no plans to build it. Several years ago, Musk said that public transit was “a pain in the ass” where you were surrounded by strangers, including possible serial killers, to justify his opposition.

source: new york times

Also: 2024 update, the total length of China’s high-speed rail tracks has now reached well over 45,000 km, or 28,000 miles, by the end of 2023.

They are additionally five years ahead of schedule and expect to double the total number within ten years. And, before someone inevitably complains about “how expensive it is”, they are turning over a net-profit of over $600M USD a year.

Via

  • mondoman712
    link
    fedilink
    English
    arrow-up
    2
    ·
    22 days ago

    full phase 1 != the IOS. The IOS is predicted to be $28–35 billion. The full phase 1, which is SF and Merced to Anaheim, and also most of the entire network, is predicted to be $128bn (as per your quote).

        • Cryophilia@lemmy.world
          link
          fedilink
          English
          arrow-up
          1
          ·
          22 days ago

          There are 3 phases to the project. The least expensive phase is estimated at $130bn ish. $500bn for the whole thing is a fair guesstimate.

          • mondoman712
            link
            fedilink
            English
            arrow-up
            1
            ·
            22 days ago

            • Merced to Bakersfield is the initial operation segment, that is estimated to cost $28–35 billion, as per your link. This is the cheapest phase that you are referring to.

            • Phase 1 adds the segments to SF and Anaheim. This is projected to cost $130 billion.

            • Phase 2 adds segments to San Diego and Sacramento. These are a long way off and I haven’t seen any cost estimates for it, but as you can see it doesn’t triple the length of the system.

            • There is no Phase 3 in the official design.

            • Cryophilia@lemmy.world
              link
              fedilink
              English
              arrow-up
              1
              ·
              22 days ago

              You’re right, there’s no phase 3. Not sure where I got that from. So put the total at around $250-300bn.

              • mondoman712
                link
                fedilink
                English
                arrow-up
                1
                ·
                22 days ago

                I’d guess with inflation you’d be right, but if we’re sticking with the current value, what on Phase 2 justifies it costing the same as Phase 1?