[T]he report’s executive summary certainly gets to the heart of their findings.

“The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs,” says the report. “But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb.”

  • SlopppyEngineer@lemmy.world
    link
    fedilink
    English
    arrow-up
    12
    ·
    6 months ago

    Why are they able to operate but we can’t use the same technology on land?

    Military budgets. You can use the tech, but no civilian can afford it.