• OceanSoap
    link
    fedilink
    arrow-up
    4
    ·
    edit-2
    1 year ago

    The conduit run should be a 45-degree elbow and come from the power trench, one two-inch. Tie the static pole to ground with a pigtail. You’ve run A-phase into B-phase before the switch, so straighten them out so A runs to A and B runs to B. C is good.