This would be amazing for anyone heading out to the bays or Wellington Airport, no intersections or lights to worry about, and it would make life so much easier for the CBD as well, not having so much through traffic in the CBD.

  • Dave@lemmy.nzM
    link
    fedilink
    arrow-up
    6
    ·
    8 months ago

    I think their point is that we don’t necessarily need to upgrade road infrastructure. The majority of the people on roads could be using public transport.

    Not the ones carrying kayaks or plumbing vans or disabled people that can’t get to a bus or train stop. But imagine how much better traffic would be for those people if all the other people were on public transport!

    • Xcf456@lemmy.nz
      link
      fedilink
      arrow-up
      3
      arrow-down
      1
      ·
      8 months ago

      Thank you. Doesn’t even have to be the majority, there’s studies out there that suggest moving as little as 10-15% of trips out of cars can take traffic from jammed up to free flowing. Although the more the better, motorways are expensive as hell and car dependency creates all sorts of wider problems.

    • thevoyagekayaking@lemmy.nz
      link
      fedilink
      arrow-up
      1
      arrow-down
      2
      ·
      8 months ago

      Given what a mess Wellington traffic is, especially getting in and out of the city, I don’t think many people are driving at the moment when public transport is an option.

      I honestly think most of the people who could use PT are already on it, at least in and out of the city.

      • Dave@lemmy.nzM
        link
        fedilink
        arrow-up
        3
        ·
        8 months ago

        Public transport is expensive. If you are a couple working in Wellington, it’s cheaper to drive in one car and pay for parking than it is to both take the train.

        And these days with second hand Leafs being cheap, even on your own it’s probably cheaper to drive. Public transport seems priced so that just enough people use it.

        Auckland transport estimated about $300m extra funding a year would allow free public transport (assuming no additional services). I remember leading into the election last year there was controversy because National devided to spend 7B on roads people didn’t think were necessary.

        We could take that money, and pay for free public transport in Auckland for 20 years, and still have 1B left over for extra pothole fixing. This is money currently allocated to roads that no one wants.

        I don’t think we have reached the peak of public transport usage, not by a long way. Though I am admitedly only talking about one side of the story. I could write another comment about things I’ve not talked about here that mean free for all probably isn’t the right answer, but my point was just that subsidising public transport further is still a good payoff. Currently using public transport as a user is not a financial no-brainer, so many people who could use it still aren’t.

        • thevoyagekayaking@lemmy.nz
          link
          fedilink
          arrow-up
          2
          arrow-down
          2
          ·
          8 months ago

          And despite that, a public transport journey is heavily subsidised, and the leaf driver is actually paying their own way via RUCs.

          I don’t understand how public transport is so expensive.

          • Dave@lemmy.nzM
            link
            fedilink
            arrow-up
            1
            ·
            8 months ago

            That’s a good point. Pre-COVID there were about 70,000 journeys on trains alone per day in Wellington (based on something I remember reading years back when trains were broken). If those people are paying say $5 per trip, and the regional council and local councils pay $5 per trip (I seem to recall council subsidies being about half?), then that’s $700,000 per day in revenue.

            If we assume weekends are lower lets just look at about 250 work days a year. That’s $175m per year to run the trains.

            It would be interesting to know where the bulk of that sits. Is it cost of staff? Bill from Kiwirail for using lines? Debt costs for borrowing to buy units?

            Depending on what exactly the bulk of the cost is would change what’s worthwhile. Mostly staff cost? That would probably grow mostly proportionally as you add more passengers. Mostly kiwirail costs? The more trains you run the less it should cost per trip.

            Though we could run free PT for 50 years if we don’t build that $10B tunnel…

              • Dave@lemmy.nzM
                link
                fedilink
                arrow-up
                2
                ·
                edit-2
                8 months ago

                In theory, but a train (at peak times) has hundreds of people, two ticket checkers, and one driver. It probably costs $200k per year to run staff for a single train for 8 hours (say, $70k for a driver which are trained internally, and $55k for each ticket taker making a bit over minimum wage), plus some control people, cleaners, etc. Say $250k per train. Trains run almost 24/7 but probably 1 less staff outside of peak times, lets say double it to cover 24/7.

                Let’s ignore intercity and say each train line is an hour long max. Two hours return trip, trains every twenty minutes, so 6 trains to a line. 3 main lines = 18 trains + say 5 more for backups and the shorter Melling line.

                18 trains x $500k per year = $9m a year. Probably some additional staff still. Let’s double it - less management staff but higher salaries. So let’s say $18m or even $20m.

                This is still a tiny fraction of the $175m annual cost estimated earlier.

                What dies a train carriage cost? It seems a couple of million per car ($210m for 70 cars).

                If it was all borrowed, and assuming 6% loan over 20 years or so, it would also be less than $20m per year.

                So far we have $40M in costs. Even if we assume I’ve underestimated or forgotten things in these categories and double it to $80M, we still have $95m to account for.

                I can’t think of other major costs except kiwirail charges. Is kiwirail charging almost $100m a year for Wellington to run (pretty) light commuter rail?

                Edit: I just saw in my link that central government/NZTA paid for 90% of the trains in Wellington, so that cuts $40m off the cost leaving $135m to kiwirail or otherwise unaccounted for.

                • thevoyagekayaking@lemmy.nz
                  link
                  fedilink
                  arrow-up
                  1
                  arrow-down
                  1
                  ·
                  8 months ago

                  There’s something else to consider, and that is all the people you lure off the road and onto public transport are not only now costing you money, but you also lose the revenue from them driving their vehicle, not only the RUCs or fuel excise, but the GST on all the running costs.

                  • Dave@lemmy.nzM
                    link
                    fedilink
                    arrow-up
                    2
                    ·
                    8 months ago

                    RUC isn’t really extra money. Vehicles using roads damage them. Less vehicles means less potholes meaning less repair cost so to a certain extent that counteracts it (I doubt it’s 1 for 1 but a large chunk least).

                    Plus we already pay for roads through rates (to some extent, councils also get money from RUC and petrol tax), no reason you can’t socialise the road costs some more once you get more optional traffic off the road. Sure higher rates but you’re getting free PT.

                    Another option often talked about is tolls. You could do that to recover the shortfall, though personally I’m against tolls in most cases as it feels like double dipping (we already have user pays through RUC and petrol tax, why not use the system we have).

                    As I mentioned earlier I’m not actually convinced that free public trandport is the right path, this was more a thought experiment (and I’m left wondering why running trains is so expensive!).